Q-Logic MKII-BASE16 Uživatelský manuál Strana 113

  • Stažení
  • Přidat do mých příruček
  • Tisk
  • Strana
    / 138
  • Tabulka s obsahem
  • ŘEŠENÍ PROBLÉMŮ
  • KNIHY
  • Hodnocené. / 5. Na základě hodnocení zákazníků
Zobrazit stránku 112
GigWorks MkII-16 Switch Model MKII-BASE16
Installer's/User's Manual 59003-01 Rev. A
Diagnostics/Troubleshooting 4-15
Fiber Continuity Tests
When there is a problem communicating over a particular fiber link and both the
Switch and the N_Port adapter pass their respective tests, check the continuity of
the fiber optic cables.
Step 1
If possible, swap another set of fiber optic cables into the faulty link.
Did this correct the problem?
Yes Replace the faulty cable.
No Contact your service representative.
Step 2
If it is not possible to swap a different set of fiber cables into the faulty link,
disconnect the SC connectors from both ends of the faulty link and shine a
flashlight through each fiber (one fiber at a time).
Did light shine through each fiber?
No Replace the faulty cable.
Yes Contact Ancor Customer Service or your authorized maintenance provider.
Fiber Continuity Test
Zobrazit stránku 112
1 2 ... 108 109 110 111 112 113 114 115 116 117 118 ... 137 138

Komentáře k této Příručce

Žádné komentáře